2014–2015Aksu, Pavlodar Region
Ash Dump No. 3 at the Aksu Power Plant
Construction and installation works at the EEC power plant site for the "Construction of Ash Dump No. 3" project: earthworks, ash slurry pipelines and clarified water pipelines. According to the client, the work was completed to a high standard, on time and with as-built documentation prepared in line with Kazakhstan building codes; no breaches of labour or fire safety rules were found.
Scope of work
- Earthworks and general construction under subcontracts No. 25 and No. 26 of 8 September 2014
- Installation of support structures and laying of ash slurry pipelines under the ash outlets of the first section of the dump
- Earthworks and installation of clarified water pipelines (pressure water main)
- Installation of support post elements under the ash outlets
- Handover of assembly units for conformity with the design drawings